The length of the pipeline is about 15m, the depth of the well is 2m, and the cement pipe of the pipeline is 300D. The pipeline has not been cleaned for a long time. The domestic garbage blocks the pipeline, resulting in poor drainage. The streets in the community are narrow, and conventional dredging vehicles cannot enter.